G98 notification for plug-in solar: what it is and why it still applies
G98 is the industry framework for connecting small-scale generation to the distribution network. A plug-in solar device is generation, so your Distribution Network Operator must be notified — the requirement does not disappear because the device uses a plug. The current arrangements allow one plug-in solar device per household, and SocketPower handles the applicable notification for kits bought from us.
Last reviewed: 13 August 2026
- Notification
- Still required
- Handled by us
- Included with every kit
- Devices
- One per household
- Who is notified
- Your regional DNO
What G98 is, in plain terms
Distribution Network Operators run the cables, substations and infrastructure that deliver electricity to your street. When a property starts generating as well as consuming, the operator needs to know: it affects how they model the local network and how they plan for what is connected to it.
G98 is the Energy Networks Association engineering recommendation that covers small-scale generation of this kind. In practice, for a domestic plug-in solar device, it means a notification containing the property details and the technical characteristics of the device.
Why it still applies to a device with a plug
The plug is a connection method, not an exemption. A compliant plug-in solar device is generating equipment feeding the same distribution network as any other domestic solar, and the framework that begins on 27 August 2026 in Great Britain sits alongside the existing network notification arrangements rather than replacing them.
The framework also sets the boundary the notification assumes: single-phase solar PV, maximum inverter apparent output of 800 VA, and one plug-in solar device per household under current arrangements. SocketPower kits are limited to 799 VA continuous AC output, comfortably inside that ceiling. Plug-in batteries and battery-integrated devices are outside the framework entirely and are not part of what we notify or sell.
The process and the timing
| Stage | What happens | Who does it |
|---|---|---|
| 1. Purchase | You buy a complete kit; G98 notification handling is included in the price. | You |
| 2. Details | We collect the installation address, contact details and confirmation of the device and its intended installation date. | You provide, we request |
| 3. Operator lookup | We identify the correct Distribution Network Operator for the address. | SocketPower |
| 4. Submission | We submit the applicable notification with the device's technical characteristics. | SocketPower |
| 5. Confirmation | We confirm the submission to you in writing and keep a record against your order. | SocketPower |
| 6. Changes | If the device is permanently removed or the property changes hands, tell us so the record can be updated. | You tell us |
What we need from you
Details required for the notification
- The full installation address, including postcode, and the property's meter point where available.
- Your name and contact details as the person responsible for the device.
- Which kit you have, so the device's technical characteristics are stated correctly.
- The date the device is, or will be, installed and in use.
- Confirmation that there is no other plug-in solar device at the property.
You can start that process on our DNO notification service page.
What stays your responsibility
Notification is an administrative obligation about the network. It is not a safety certificate and not a permission to install. Alongside it you still need to:
Alongside notification
- Follow the instructions supplied with your product exactly.
- Confirm the socket and circuit are suitable, with modern residual-current protection, and never use an extension lead or any adaptor.
- Obtain any permission required by your tenancy, lease, landlord, freeholder, managing agent or relevant authority.
- Keep to one plug-in solar device per household, and never extend, modify or combine kits.
- Use a qualified electrician for any work on fixed wiring, including installing or certifying an outdoor socket.
G98 questions
Sources
- Energy Networks Association — connecting small-scale generation (G98)(opens in a new tab) — Energy Networks Association
- The Plugs and Sockets etc. (Amendment) Regulations 2026 (SI 2026/848)(opens in a new tab) — legislation.gov.uk
- Plug-in solar: government response (July 2026)(opens in a new tab) — DESNZ (PDF)
- Final Plug-in Solar Device Interim Product Specification(opens in a new tab) — DESNZ (PDF)
Keep reading
Guide
Best plug-in solar panels UK
How to choose the best plug-in solar panels and kits in the UK: compare price, panel capacity, space needed, monitoring and compliance, and pick the right system for your home.
Guide
Lidl plug-in solar
What Lidl GB has actually said about plug-in solar, whether Lidl solar panels are on sale in the UK yet, when a kit could arrive, and what any Lidl plug-in solar panel would need to meet in Great Britain.
Guide
EcoFlow plug-in solar
What EcoFlow's STREAM plug-and-play solar range is in the UK, the panel options and listed price at the review date, why solar-only and battery products are not the same thing under the Great Britain framework, and what to verify before buying.
Editorial note · Last reviewed 13 August 2026
Written and reviewed by SocketPower, a trading name of Storm Renewables Ltd (SC802881). This guide is general information about plug-in solar in Great Britain, not electrical design advice for your property. Always follow the instructions supplied with your product and use a qualified electrician for any work on your fixed wiring.
Plug-in solar in Great Britain: the framework covers single-phase solar PV with a maximum inverter apparent output of 800 VA, and SocketPower devices are limited to 799 VA continuous AC output. Plug-in batteries and battery-integrated devices are outside the framework and are not sold by SocketPower. The current G98 arrangements allow one plug-in solar device per household, and network notification remains required — SocketPower handles the applicable notification for kits bought from us. This framework applies in Great Britain from 27 August 2026 and not in Northern Ireland. Always follow the instructions supplied with your product, check that your socket and circuit are suitable, never use extension leads, multiway adaptors, travel adaptors or plug-in RCD adaptors, and obtain any permissions you need before installing.