Original data · Great Britain
Where in Britain does plug-in solar pay back fastest?
Plug-in solar pays back fastest on the south coast and slowest in the far north of Scotland — but the spread across Great Britain is far smaller than most people assume, and it is dwarfed by two things you control: shading and how much of the generation you actually use at the time it is produced.
Last reviewed: 13 August 2026
- Regions modelled
- Five irradiance bands
- Kits modelled
- All four in the range
- North–south spread
- 24% of annual output
- Framework live
- 27 August 2026
The headline finding
Modelled on identical assumptions, the Pro Compact 515W generates around 487 kWh a year in the sunniest band we model and 394 kWh in the least sunny — a spread of about 24%. Payback moves from 7.6 years to 9.4 years.
That is a real difference, and it is worth knowing before you buy. But it is smaller than the swing caused by a badly shaded position, and much smaller than the swing caused by self-consumption. A Highland household that uses most of its generation will beat a Cornish household that exports most of it.
Generation and payback by region
The Pro Compact 515W at £599 is used as the reference kit, because it is the entry point to the range.
| Region | Annual generation | Used in the home | Annual saving | Payback | CO₂ avoided / yr |
|---|---|---|---|---|---|
| Scotland and the far north Aberdeen, Inverness, Glasgow, Edinburgh, Dundee | 394 kWh | 236 kWh | £64 | 9.4 yrs | 47 kg |
| Northern England, Northern Ireland border counties and North Wales Newcastle, Leeds, Manchester, Liverpool, Bangor | 417 kWh | 250 kWh | £68 | 8.9 yrs | 50 kg |
| The Midlands and mid Wales Birmingham, Nottingham, Leicester, Shrewsbury, Aberystwyth | 440 kWh | 264 kWh | £71 | 8.4 yrs | 53 kg |
| Southern England, London and South Wales London, Bristol, Cardiff, Oxford, Norwich | 464 kWh | 278 kWh | £75 | 8 yrs | 56 kg |
| The south coast and the West Country Brighton, Portsmouth, Bournemouth, Exeter, Truro | 487 kWh | 292 kWh | £79 | 7.6 yrs | 58 kg |
Every kit, every region
Larger kits generate more but cost more, so payback does not automatically improve with size. The full grid lets you see where each kit lands.
Pro Duo 890W — 890W DC, £999
| Region | Annual generation | Annual saving | Payback |
|---|---|---|---|
| Scotland and the far north | 672 kWh | £109 | 9.2 yrs |
| Northern England, Northern Ireland border counties and North Wales | 711 kWh | £115 | 8.7 yrs |
| The Midlands and mid Wales | 751 kWh | £122 | 8.2 yrs |
| Southern England, London and South Wales | 790 kWh | £128 | 7.8 yrs |
| The south coast and the West Country | 830 kWh | £134 | 7.4 yrs |
Pro Plus 1030W — 1030W DC, £1,099
| Region | Annual generation | Annual saving | Payback |
|---|---|---|---|
| Scotland and the far north | 761 kWh | £123 | 8.9 yrs |
| Northern England, Northern Ireland border counties and North Wales | 805 kWh | £130 | 8.4 yrs |
| The Midlands and mid Wales | 850 kWh | £138 | 8 yrs |
| Southern England, London and South Wales | 895 kWh | £145 | 7.6 yrs |
| The south coast and the West Country | 940 kWh | £152 | 7.2 yrs |
Pro Max 1260W — 1260W DC, £1,199
| Region | Annual generation | Annual saving | Payback |
|---|---|---|---|
| Scotland and the far north | 897 kWh | £145 | 8.2 yrs |
| Northern England, Northern Ireland border counties and North Wales | 950 kWh | £154 | 7.8 yrs |
| The Midlands and mid Wales | 1003 kWh | £162 | 7.4 yrs |
| Southern England, London and South Wales | 1055 kWh | £171 | 7 yrs |
| The south coast and the West Country | 1108 kWh | £180 | 6.7 yrs |
Methodology
Annual generation is modelled as DC panel capacity in kWp × a regional yield figure in kWh per kWp per year, adjusted by orientation, shading, tilt and inverter clipping. Savings are the self-consumed share valued at the import tariff. Payback is the kit RRP divided by the annual saving.
- South-facing array at roughly 30° tilt, the reference case for a free-standing garden or patio position.
- Light shading applied everywhere — a realistic domestic garden rather than an unobstructed test site.
- 60% self-consumption: the share of generation used in the home at the moment it is produced. Only this share saves money.
- 27p per kWh import tariff, held constant across every region so the comparison isolates location alone.
- Inverter clipping applied where DC panel capacity exceeds the 799 VA AC ceiling.
- Payback uses the kit RRP only, with no allowance for tariff changes, degradation or resale value.
Constants used: 27p/kWh import tariff, 60% self-consumption, south-facing, 30° tilt, light shading. Regional yield bands run from 850 kWh/kWp in the far north to 1,050 kWh/kWp on the south coast.
Limitations we will not paper over
These are modelled figures, not metered results. We have no installed base to publish real generation data from yet — the framework only commences on 27 August 2026. When we do have consented customer data, we will publish measured output alongside this model and show where the model was wrong.
What moves the result more than your postcode
Self-consumption
Halving self-consumption from 60% to 30% roughly halves the saving. Running the dishwasher, washing machine, hot water or an EV charge during daylight matters more than living two hundred miles further south.
Shading
Moving from light to heavy shading removes around 39% of annual output — more than double the entire north-to-south spread. A fence, a hedge or a neighbour's extension is the first thing to check.
Your tariff
Every kWh you avoid buying is worth exactly what you would have paid for it. A higher unit rate shortens payback proportionally.
Common questions
Sources
Editorial note · Last reviewed 13 August 2026
Written and reviewed by SocketPower, a trading name of Storm Renewables Ltd (SC802881). This guide is general information about plug-in solar in Great Britain, not electrical design advice for your property. Always follow the instructions supplied with your product and use a qualified electrician for any work on your fixed wiring.
Keep reading
Guide
Garden & patio solar
How to position a plug-in solar kit in a garden, on a patio or on a ground-accessible flat roof: orientation, ballast, cable routing, the external socket requirement and permissions.
Guide
Winter output
Realistic month-by-month plug-in solar output in Great Britain, why December generates a fraction of June, what that means for savings, and how to look after a kit through winter weather.
Guide
Plug-in vs rooftop
Cost, output, installation, permissions, export payments and portability compared. Where plug-in solar is the better answer, and where a full rooftop system genuinely is not replaceable.
Plug-in solar in Great Britain: the framework covers single-phase solar PV with a maximum inverter apparent output of 800 VA, and SocketPower devices are limited to 799 VA continuous AC output. Plug-in batteries and battery-integrated devices are outside the framework and are not sold by SocketPower. The current G98 arrangements allow one plug-in solar device per household, and network notification remains required — SocketPower handles the applicable notification for kits bought from us. This framework applies in Great Britain from 27 August 2026 and not in Northern Ireland. Always follow the instructions supplied with your product, check that your socket and circuit are suitable, never use extension leads, multiway adaptors, travel adaptors or plug-in RCD adaptors, and obtain any permissions you need before installing.